Architect and resident Steve Cantrell presented an overview of Phase Two, C Point renovation project:

  • Will commence this Spring with completion by "the beginning of the boating season".  
  • Includes the demolition and construction of the bathrooms:
    • Three men's, three women's stalls, two stainless sinks each, plus one "family" facility for baby changing.
    •  Two showers outside.
    • Design complimentary to the Pavillion.
    • Utilities to be underground.Ease of opening/closing if Pavilion used for an event during winter.
  • The elevation of the bathroom will be lowered 3 feet from current.
  • The road will no longer create an "island" around bathroom but rather route just on one side, making access from the beach w/o crossing road.
  • 66 total marked parking spots to compliment the two lane road in/out.
  • "No special assessment", financed through normal "cash flow". 
I believe a rendering of the new structure is @ City Hall.